Installation
2.4
52
2.4 Installation
Product Completeness Check
Before installing this product, check whether the delivery is complete according to the
following packing list and read this manual thoroughly. The manufacturer cannot be
held responsible for any damage incurred due to an incorrect use of this product in
contradiction with this manual. The warranty terms do not cover damage to the
product caused by rough handling, incorrect storage or exceeding the quoted technical
parameters.
Basic packing list items:
Item
Rack with AC
power supply
Rack with DC
power supply
Power cable 2.5m
1
1
Mounting set
1
1
Software CD
1
1
Twisted cable for
headset
1
1
Headset for test
calls
1
1
Serial 9F-9F cable
1
1
Additional packing list items:
Included device
1PRI
card
2PRI
card
VoIP
card
Basic
CPU card
Enhanced
CPU card
Ethernet cable 3m
1
2
1
Ethernet cable 0.6m
1
2
Note
The packing lists are the same for all the gateway types (2N
®
StarGate /
BlueStar / BlueTower).
Installation Conditions
The following conditions must be met during system installation:
Appropriate location (enough free space);
GSM / UMTS signal intensity (minimum recommended signal level
: –80dB
).
You can use the NET monitor on a mobile phone (e.g. Nokia, Siemens) or the
diagnostics screen in the configuration tool for measuring the GSM / UMTS
signal intensity;
Summary of Contents for BlueStar
Page 6: ......
Page 20: ......
Page 24: ...Plug In Boards 2 1 24 Fig 2 1 Configuration Jumpers ...
Page 28: ...Plug In Boards 2 1 28 Fig 2 2 Configuration Jumpers JP3 ...
Page 62: ......
Page 75: ...Configuration Tool 3 4 75 ...
Page 162: ......