Installation manual 2N® IP Force
39
/
118
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
•
•
Make a hole using the template.
Suppose that all the required cables have been carried
into the hole.
Put the intercom inside and place the set onto the hole
to make sure that the hole is deep enough and the
uneven edge is perfectly covered with the frame.
If the hole is perfect, wall in the flush mounting box.
Remove the front panel from the intercom.
Select the holes for cable supply. Insert the blanks into
the other holes. Apply the cable bushings or a suitable
sealant to prevent penetration of insects or water. You
can also insert the small bushing in the intercom
bottom hole.
Put the frame on the intercom.
Place the intercom into the flush mounting box while
introducing the cables. Leave some of the cables inside
the unit as a reserve and the rest under the intercom
bottom.
Insert the supplied screws in the side mounting holes
making sure that they penetrate into the flush mounting
box nuts. Tighten all the screws properly. Tip: The screw
tightening sequence may affect the intercom position.
We recommend to seal the frame – wall gap with a
silicone or another sealant to avoid wall dampening as a
result of water leakage.
Do not complete mounting until you have finished
electrical installation.
Be sure keep strictly the hole dimensions while mounting the device into
classic bricks.
Flush Mounting – Thermally Insulated Wall
What You Need:
Longer screws (depending on the thermal insulation thickness)
Hole: (112 x 220 x 70) mm
Cut out the thermal insulation layer using the template (the same as for
classic brick wall).
•
•
Tip
While flush mounting, pull the cables through the device back opening leaving a reserve cable
length behind the device if necessary.
If the cables cannot be cut in the wall deep enough, you can use a smaller hole on the device
bottom.
Summary of Contents for IP Force 9151101W
Page 1: ...Installation manual 2N IP Force v 2 18 www 2n com...
Page 49: ...Installation manual 2N IP Force 49 118 2N IP Force Connectors PCB Version 555v3...
Page 50: ...Installation manual 2N IP Force 50 118 2N IP Force Connectors PCB Version 555v4...
Page 65: ...Installation manual 2N IP Force 65 118...
Page 66: ...Installation manual 2N IP Force 66 118...
Page 70: ...Mounting guide...
Page 72: ...Installation manual 2N IP Force 72 118...
Page 73: ...Module setting...
Page 78: ...Installation manual 2N IP Force 78 118...
Page 79: ...Installation manual 2N IP Force 79 118...
Page 80: ...Module setting...
Page 83: ...Active output...
Page 85: ...Installation manual 2N IP Force 85 118...
Page 86: ...Installation manual 2N IP Force 86 118...
Page 87: ...Module setting...
Page 89: ...Security Relay...
Page 94: ...Installation manual 2N IP Force 94 118 Connection...
Page 98: ...Installation manual 2N IP Force 98 118...