2VV.
Creating innovative solutions for you and your business since 1995.
ver.5 5-05-20
6.1-3 Unit anchoring
The anchoring points must be set out according
to the following drilling template.
Fixing of the unit by 4 ~ 8 M10 bolts at the
bottom of the bracket
ATTENTION!
● The unit must be fixed to the base so it cannot
move accidentally.
● With respect to the weight of the unit, it is nece
-
ssary to use a corresponding handling device to
lift it up (e.g. a forklift).
YOU WILL NEED
● 4 ~ 8 self-locking nuts, size M8 (depending on
the unit´s type)
● 4 ~ 8 threaded rods
● 4 ~ 8 dowels of a corresponding type and dimen
-
sions (depending on the material of the ceiling
and the unit´s weight).
● drill and drill bits of corresponding dimensions
● pliers and correct size spanner wrench
Place the unit in a horizontal position then tilt it
about 3° so that the condensate can drain away.
Fasten the unit with screws.
6. INSTALLATION
X
Y
A
B
NEOPLAY 2 - PODSTAVCE
Velikost
A
B
X
Y
800 V
516
1548
444
1300
1500 V
586
1850
514
1760
2500 V
624
2110
552
1300
3500 V
885
2565
793
2200
4500 V
1005
2565
913
2200
5500 V
1368
2565
1276
2200
800 H
972
1420
920
1300
1500 H
1426
1710
1354
1600
2500 H
1751
2030
1679
1900
3500 H
1911
2220
1839
1900
Type
B
A
X
Y
Kg*
516
586
624
885
1005
1368
1548
1850
2110
2565
2565
2565
444
514
552
793
913
1276
1300
1760
1300
2200
2200
2200
257
298
399
569
619
715
all dimensions are in mm
* - the total weight of the heaviest unit in the category
HR95-080..-..-....
HR95-150..-..-....
HR95-250..-..-....
HR95-350..-..-....
HR95-450..-..-....
HR95-550..-..-....