26
27
2VV.
Creating innovative solutions for you and your business since 1995.
ver.5 5-05-20
7. COMMISSIONING
READ CAREFULLY
Please check the following points before putting
the unit into operation:
● That the unit is fixed well to the supporting
structure.
● That the unit is closed correctly and that a pipe
or a rain louvre is installed to each neck to avoid
contact with any rotating or heating component.
● That the electrical wiring is connected correctly,
including grounding and protection against ex
-
ternal activation.
● That all accessories are connected correctly.
● That the condensate drain is connected correctly
to the discharge piping (for units with cooling).
● That the connection is in compliance with in
-
structions in this manual.
● That no tool or other subject has been left inside
the unit – this could lead to damage to the unit
ATTENTION!
● Any interventions or modifications to unit wiring
are prohibited and may lead to loss of warranty!
● We recommend to use accessories supplied by
our company. If in doubt whether to use unori
-
ginal accessories, please contact 2VV.
7.1 ACTIVATION
Put the unit into operation (Stand-by) by turning
the main switch to position I (ON). When the main
switch is turned on the control unit´s display li-
ghts up and the service data load. Service data
will start to load. The unit is ready to start after
the service data are loaded.
0
1