10
11
2VV.
Creating innovative solutions for you and your business since 1995.
ver.3 29-04-20
6.1-3 Hanging the unit
• The support of the unit should be sufficiently
strong, it must correspond to the unit’s weight!
• Given its weight, lifting equipment will be re
-
quired when installing the unit (e.g. a forklift)
or at least two more people to hold it.
● 4 M8 lock nuts
● 4 threaded rods
● 4 dowels
of suitable type and size (depend
-
ing on the material of the ceiling and the weight
of the unit)
● drill with bits of suitable type and size
● pliers and wrenches
Place the unit horizontally and then tilt it
3° to drain the condensate.
YOU WILL NEED
6. INSTALLATION
Type
A
B
HRFL2-040
700
1120
HRFL2-070
1000
1330
HRFL2-150
1300
1630
HRFL2-200
1630
1930
Use the drilling template below
to place the anchoring points.
A
B
Drill the openings in the ceiling, check the strength
of the material and fasten the unit to the side
brackets
with the ZTZ-M8/1,0 threaded rods.
ATTENTION!
Type
Weight of unit (kg)
Weight of accesso-
ries (kg)
Without
reheating
With electric
reheating
With water
reheating
C/O mod-
ule
DX module
HRFL2-040
70
75
75
25.5
24
HRFL2-070
90
95
95
32
30
HRFL2-150
165
170
170
37
35
HRFL2-200
240
245
245
43
40