background image

INSTALL 360 Y-DROP  

BOOM

 

Figure 9

 

Step 1

   Assemble 5' boom sections (1) utilizing 

8" boom connectors (2) and the supplied 
hardware. 

Hardware Bag CC

 

Step 2

    Repeat Step 1 as needed in order to  

assemble the entire 360 Y-DROP boom.

 

Step 3

    Set the 360 Y-DROP boom assembly onto  

boom bracket (3). 

   Repeat Steps 1 -3 for the remaining boom assemblies.

 

 

 

 CAUTION:  The 360 Y-DROP boom assembly may 
weigh up to 150 lbs. (68 kg). Exercise caution and 
enlist help for this process.

 

Figure 10

  

Step 4

   In order to span the full length of the  

center section 360 Y-DROP boom, you  
will need to cut and drill one of the 5'  
boom sections to 1'. Mount this 1' section 
between two full 5' boom sections. Drill a 
7/16" through hole centered 2" from the 
outside edge.

 

Figures 11 and 12

  

Step 5

   Install square U-bolt (1), the 5/16" extra 

thick washers, and the 5/16" nuts over  
the 360 Y-DROP boom (2). 

Hardware Kit A

 

 

Step 6

   Install stop bolt (3) at the both the front 

and the rear of the extension tube.  
Repeat for remaining stop bolts. 

Hardware Kit B

 

 

Step 7

   Install stainless steel set screw and  

jam nut assembly (4). See Figure 12 for  
detail. Repeat for the remaining mount  
assemblies on the primary boom.

IV.

360YIELDCENTER.COM

6

Figure 9  

Figure 10

Figure 11

Figure 12

1

2

4

4

3

3

1

2

INSTRUCTIONS 360 Y-DROP

HAGIE STS 80', 90' & 100' STEEL BOOMS 

Summary of Contents for 360 Y-DROP HAGIE STS 80

Page 1: ...Please visit productregistration 360yieldcenter com to complete the product registration for your 360 Y DROP so we can better support our products from day one and ensure you have the latest upgrades...

Page 2: ...lowing steps of the guide and the pictures may not exactly reflect your model While these steps will help you install most of your 360 Y DROP system you may need to custom fit some components with you...

Page 3: ...e 3 Step 2 From the center measure out 51 5 on either side as shown in Figure 3 NOTE The center mounting position will have to be offset in order to eliminate conflict with the center riser mount Step...

Page 4: ...boom clamp 2 on the bottom of the OEM primary boom Step 3 Install bracket assembly 3 and the flange lock nut 4 Hardware Kit D Step 4 Install extension tube 5 Repeat Steps 1 4 for the the other OEM mo...

Page 5: ...as shown in Figure 7 and install the 3 8 flange nuts 5 Step 3 Install extension tube 6 onto bracket assembly 4 Step 4 Install boom bracket 7 Figure 8 Step 5 Install a carriage bolt and nut 1 on the fr...

Page 6: ...m you will need to cut and drill one of the 5 boom sections to 1 Mount this 1 section between two full 5 boom sections Drill a 7 16 through hole centered 2 from the outside edge Figures 11 and 12 Step...

Page 7: ...Install riser tube assembly 1 into the breakaway assembly one piece 2 Step 3 Install pin 3 Repeat Steps 2 and 3 for the remaining riser tube assemblies NOTE Included in most sprayer mount packages ar...

Page 8: ...s Hardware Kit C Figure 17 Figure 17 may show more or fewer riser mounts than your installation The alignment and quantity of the riser mounts will depend on your row spacing Figure 18 Step 2 Install...

Page 9: ...1 onto riser tube 2 Figure 20 Step 2 Install base unit 1 onto riser tube 2 Figure 21 Step 3 Assemble drag hoses 1 to 360 Y DROP base and secure with hose clamps 2 Figure 22 Step 4 Note the orientation...

Page 10: ...5 Install two screws 1 Step 6 Install two screws 2 Figure 24 Step 7 Install rubber washer 3 into the Y Figure 25 Step 8 Install riser hose assembly 1 into the Y Figure 26 Step 9 Route riser hose assem...

Reviews: