106
A
PPENDIX
B: S
ITE
R
EQUIREMENTS
, S
AFETY
,
AND
P
REINSTALLATION
I
NFORMATION
Figure 54 shows the Telco and Metric slots and the
location of the preinstalled rack-mount flange on
an 8-slot chassis.
Figure 54
Preinstalled Rack-mount Flange Location and Slot
Types on the CoreBuilder 9000 8-slot Chassis
Figure 55 shows the Telco and Metric slots and the
location of the preinstalled rack-mount flange on a
16-slot chassis.
Figure 55
Preinstalled Rack-mount Flange Location and Slot
Types on the CoreBuilder 9000 16-slot Chassis
■
If you want to use an optional cable management
device on a 8-slot chassis or a 16-slot chassis,
install it above or below the chassis (depending on
which type of device you choose). You can install
the chassis in the rack either before or after you
install a cable management device.
For detailed information about installing a cable
management device, see the
Chassis Quick
Installation Guide for the CoreBuilder 9000
Enterprise Switch 8-slot Chassis and 16-slot
Chassis
.
3
4
5
6
7
8
9
10
CoreBuilder
®
9000
Telco rack
open slot
Preinstalled
flange pin
Metric rack
closed slot
CoreBuilder
®
9000
3
4
5
6
7
8
12
13
16
9
10
11
14
15
Telco rack
open slot
Preinstalled
flange pin
Metric rack
closed slot
Summary of Contents for 3CB9E7 - CoreBuilder 9000 Chassis Switch
Page 54: ...54 CHAPTER 4 COREBUILDER 9000 ENTERPRISE SWITCH MODULES...
Page 60: ...60 CHAPTER 5 START THE SWITCH...
Page 74: ...74 CHAPTER 7 MAINTENANCE FOR THE 7 SLOT CHASSIS...
Page 88: ...88 CHAPTER 8 MAINTENANCE FOR THE 8 SLOT CHASSIS AND THE 16 SLOT CHASSIS...
Page 96: ...96 APPENDIX A SPECIFICATIONS...
Page 112: ...112 APPENDIX C INTELLIGENT POWER SUBSYSTEM...
Page 118: ...118 APPENDIX D TECHNICAL SUPPORT...