5-4
Figure 5-5
Set HyperTerminal properties
Firewall Power-on
Checklist for Firewall Power-on
Before powering on the firewall, check that:
z
The power cord and ground cable are correctly connected.
z
The voltage of the power source conforms to voltage requirements of the firewall.
z
The console cable is correctly connected. The configuration terminal or PC is powered on and the
emulation program is properly configured.
z
If an external CF card is needed to store applications, the CF card is properly installed.
Before powering on the firewall, locate the power switch so that you can disconnect the power supply in
time in case of an emergency.