-
Fit the elevator bellcrank to fuse 4 with a small amount of hot glue as indicated below.
9
Glue fuse 4 to the remaining fuse sections.
10
Glue the “Vertical stabilizer lower” section to the fuse using the 3mm skewer as a guide. You
may need to remove some material from the top of this section where the push rod is
required to pass through.
11
Remove the highlighted section of the “Vertical stabilizer upper front” in order for the elevator
push rod to pass through.