1.
2.
1.
2.
3.
Lift chamber door.
Lift up build platform and pull out, then install a clean platform or close chamber door.
See 7.2 Install & Remove Material Bottles and
8.4 Manage Build Jobs
The client software will not send build jobs to the printer until job confirmed by selecting
checkbox on Submit dialog box or
Preparation Only
resubmit a saved build job.
Click printer's icon in client software to open printer's Info window.
Select build job with
of
or
.
Job Status
Needs Confirm
Saved
Click
button or choose
located on the tool bar of the printer's window.
Confirm
Job > Confirm
Summary of Contents for ProJet 5000
Page 34: ...This view point button is a back two dimensional viewpoint Bottom View ...
Page 36: ...A bounding box for a set of objects is a cuboid that completely contains the set Copy ...
Page 41: ...This view point button is a front two dimensional viewpoint Help Topics ...
Page 45: ...This view point button is a right two dimensional viewpoint Rotate ...
Page 60: ...Using a wire frame allows visualization of the underlying design structure of a part Zoom ...