ii
p/n 15-D99, rev C
3D Systems, Inc.
4.1 Dimensions of Assembled System - Front View
4.2 Dimensions of Assembled System - Top View
4.3 Minimum Workspace Specifications - Front View
4.4 Minimum Workspace Specifications - Top View
4.5 Workspace Specifications - Optional Sieving Station
4.7.1 Drill Locations for Anchor Bolts
SAFETY REQUIREMENTS IN THE PRODUCTION HALL
5.1.1 Local and Company Specific Regulations
5.1.3 Personal Protective Equipment (PPE)
5.3 Special Considerations - Reactive Metals
5.3.6 Emergency Eye Wash Station
UTILITIES AND EQUIPMENT REQUIREMENTS
6.2.2 Customer Grounding Requirements
6.4 Compressed Air Requirements