3D Systems, Inc.
37
p/n: 15-D99, rev. C
Utilities and Equipment
Requirements
Atmosphere requirements completed
Refer to chapter 6
Electrical requirements completed
3 phase + N + GND electrical cable available (to be supplied
by customer)
400 VAC, 50/60 Hz, 3-phase power available
Measured values:________ VAC, ________ Hz, _______Phase
Transformer installed (if required)
Inert gas requirements completed
Compressed air requirements completed
Cooling fluid additives present (only cooling fluids specified
in §4.8 may be used)
Network Requirements
Computer and network requirements completed
Refer to chapter 7
3D connect requirements acknowledged (optional service)
CSE requires configuration data during installation
Lifting Equipment
Lifting equipment ava certified lifting equipment
operator on site at the time of installation.
Refer to chapter 8
Comments
Signature
3D SYSTEMS RESERVES THE RIGHT TO RECEIVE COMPENSATION FOR NONPRODUCTIVE TIME AND
TRAVEL DUE TO FALSE OR INCORRECT INFORMATION ON THIS FORM.
SECTION FILLED OUT BY 3D SYSTEMS
Sales order number (S.O.)
Printer serial number