3D Systems, Inc.
47
p/n: 15-D100, rev. D
•
Material batch tracking
(
Engineering level only
): This option
remains available. If you use material batch numbers to trace
your production, you can switch this on via
DMP Control
>
Admin
>
Configurations
>
Machine configuration…
Then
configure the three relevant settings:
>
optMaterialBatchNumberRequest
: set to True to
enable batch number tracking and logging
>
optMaterialBatchNumberFormatMask
: set this to
configure a specific formatting required for the batch
name. Set empty to allow any text. For detailed options
see the DMP FAQ document
>
optMaterialBatchNumberFormatCursorStartPosition
:
see description at bottom of the window and DMP FAQ
document
Once Material batch tracking is enabled, the material dialog
windows will show the material batch number input boxes.
Batch numbers will be included in all job logs, event logs and
other optionally enabled tracking systems.
Caution: Restart all DMP software after changing the
machine configuration.
D. Tools (only in Engineer user level)
•
Machine configuration
: Clicking this button will refer the user to
DMP Control
to edit the machine configuration.
E. Info
•
Show message
: Click to open a note pad to leave a
message for the following operator.