2.
When TPM bath finishes, unclamp the build platform from the RAMCO platform and hold build platform perpendicular to the
RAMCO vat to drain excess TPM.
3.
Move build platform onto IPA RAMCO at a slant and flip the switch on the console (circled below-right) to start the IPA bath.
4.
After IPA bath is finished, hold build platform at an angle above the IPA vat to drain excess IPA.
5.
Set build platform on offload cart or other large, sturdy cart to prepare for part removal.
6. With nitrile gloves on, use a putty knife or other viable tool to scrape the build’s supports off the build platform.
7. Carefully remove other support structures by hand.
Drain excess TPM over TPM RAMCO.
Put build platform on IPA RAMCO.