15
8.18 Separate buffer tube(s), strength member and bond members. Build another collar between buffer tube(s),
strength members and bonding strap so distance between collar outer edges is 5" (127 mm). Wrap two more
layers of foam tape around outside of tubes.
5" (127 mm)
8.19 Lay a 5" (127 mm) long piece of E-Z wrap lengthwise on the
workstation and position between foam collars. Wrap E-Z wrap
edges around foam collars.
8.20 Cut corner of 4445 Sealant bag. Starting at opposite end, force
sealant out and fill area between foam collars.
Note:
Carefully follow health, safety and disposal instructions as
given on Material Safety Data Sheet or product label for
4445 Sealant.
Note:
Protective gloves should be worn during sealant
dispensing and overwrapping steps.
8.21 Overwrap with at least two additional half-lapped layers of E-Z
wrap.
8.22 Secure E-Z wrap by compressing foam collar ends with three half-
lapped highly stretched 3/4" (19 mm) vinyl tape.
8.23 Evenly work sealant between buffer tubes and strength members.