6
5.1
Install bonding connectors per system practice. Bonds
should be placed so that the studs of the connectors are
facing forward.
5.0 Bonding and Grounding
6.0 Splicing
6.1
Splice per company practice.
6.2
Splice in tail of a terminal block when required.
5.3
Insulate bonding connectors by wrapping with vinyl tape.
5.2
Install external ground wires to bonding connector studs
and run along the cables.
Summary of Contents for 4604
Page 1: ...June 1998 34 7045 6337 7 A Re enterable PST Dome Closure Instructions ...
Page 2: ...2 ...
Page 15: ...15 ...