10
9.5
Pull the core material from the PST until the PST is even with
the bottom of the closure.
9.6
Place assembly over splice and onto gel end seal. Insure the
wireform latch and the 3M logo are facing forward.
9.7
Continuously push PST downward while pulling the rest of the core
material.
9.8
When the PST is in place, remove the core wrap from around the
cable.
9.9
For pedestal closure applications, secure the closure to pedestal,
mount terminal block and connect ground wires according to system
practice.
Obsolete
Document