6
78-8096-4635-5-C
1"
1/4"
3–1/2"
Depth Of
Terminal
Lug Barrel
For Ribbon Shielding
Cable Jacket
Cable Metallic Shield
Cable Semi-Conductive Material
Cable Insulation
Figure 7a
Cable Semi-Conductive Material
Cable Insulation
Cable Shield Wires
Cable Jacket
Depth Of
Terminal
Lug Barrel
3–1/4"
1–1/4"
For Wire Shielding
Figure 7b
Cable Semi-Conductive Jacket
Cable Shield Wires
Cable Insulation
Depth Of
Terminal
Lug Barrel
4"
1/2"
For UniShield
®
Figure 7c
5.6 Clean cable insulation by using solvent saturated cloths.
Do not allow solvent to touch cable semi-con.
If
abrasive must be used to remove imbedded semi-con from cable insulation, use a non-conductive, 120 grit
aluminum oxide, such as in the Scotch
®
Cable Prep Kit CC–2 or 3M
™
Abrasive Roll A–3.
6.0 Install Stress Relief
6.1 Apply two half-lapped layers of Scotch
®
Stress Control Tape 2220 for 1/4" onto the cable semi-con (1/2" onto
UniShield
®
jacket) and extend two inches onto cable insulation (wrap tape silver side out). Figures 8a, 8b or 8c,
depending on type of cable shielding.
NOTE: Grounding
If practice calls for an external ground, a 3M Ground Strap Assembly Kit (GS–1, GS–2 and GS–3) is available
from your local distributor for use on ribbon shield cable. Follow procedure for these kits for grounding. For
UniShield
®
and wire shield cable, a ground strap assembly kit is not necessary. Simply fold the wires back over
jacket to connect to the system ground.