3M™ AT9000 MK2 Full Page Reader User Guide
Installing
the Reader
Unpack the reader
Each reader package consists of:
•
3M AT9000 MK2 Full-Page Reader
•
Power supply converter and AC cable (optional)
•
Test card
•
USB communication cable
•
3M™ Scotch-Brite™ Microfiber Cleaning Cloth
•
Software download instructions
To unpack the reader:
1. Remove the contents from the box and separate the components from the packing material.
2. Verify that all the parts described have been received. If any parts are missing, contact 3M Global
Technical Services (GTS).
3. Keep and store the original packaging in the event that the reader requires shipment back to 3M for
maintenance.
Note:
If the reader has been stored in a cold environment (i.e. below room temperature), allow the
reader warm up for a minimum two hours before powering it on.
DO NOT connect the reader to the computer until you have installed the software. See “Install
the software” on page 15.
Copyright 2018 IDScience Inc. Rev. 20180725