10
78-8140-3820-0-B
Mastic Collar Build
8.3
Mark the cables approximately .25 inches (6
mm) from the end of sheath. This is to locate
the mastic collar.
8.4
Washers can be split along the notch for
installation over the cable.
8.5
Install two washers on each cable near the
sheath end as shown..
8.6
Unroll the mastic and measure out the required
amount. Repeat for second cable.
Note: See chart in section 6.2 for required mastic length.
Note: Warm mastic before use if temperature is below
50˚F (10˚C).