12
78-8140-3820-0-B
8.10 Peel the mastic rope from the liner and place into the groove in the 3M
™
External Cable Assembly Module
(ECAM)
Double Cable Entry Port ECAM-20 mm-D bottom half. Press the mastic rope in place and route
as shown. Make sure at least .25 inches (6 mm) of the mastic rope extends out both ends as shown.
8.11 Install the first cable into ECAM housing
bottom half. Note the grooves in the housing for
locating washers.
Note: If different-sized cables are used, ensure the cable
is placed into the correct cable clamp shell set in
the bottom housing.
Note: On cables prepared for grounding, install the cable
into the bottom housing with the cable sheath tab
facing up as shown.
8.12 Install the second cable into the housing. Note
that the washers are offset from the first set.
Note: Ensure the washers are properly seated into their
corresponding grooves in the bottom housing.