III. Pedestal Cabinet Cable Routing
A. MS
2
4065 (300-Pair) Cabinet
1. Pairs to be terminated must run through the grommeted
holes in Hinged Panel.
2. Form a .6 m (2 ft.) gooseneck behind Panel to allow for
slack. See Figure 37.
3. The loop through cable (express pairs) should be taped
or wrapped and secured to rear of cabinet.
4. Cable Ties are provided to secure cable to Backboard.
B. MS
2
4080 (600-Pair) Cabinet
MS
2
4082 (900-Pair) Cabinet
MS
2
4084 (1800-Pair) Cabinet
MS
2
4086 (2700-Pair) Cabinet
1. Allow 76 - 102 mm (3" - 4") of cable slack by forming
a dog-leg and temporarily tie cable in place. This
prevents stress damage to Modules during normal
settling and shifting of ground. See Figure 38.
2. Remove tie after completion of terminating.
C. Cable Terminated In Cabinet
1. If feeder or distribution pair count exceeds the capacity
of the front side of the Frame, the balance should be
terminated on the rear Frame.
2. Bond and secure cables to Bond Bar per standard
procedure.
3. Repeat until all cables are bonded and secured.
D. Cable Looped Through Cabinet
1. Identify binder groups that will terminate in this
Cabinet.
2. Lay express binder groups in unused Frame (or behind
Frame on MS
2
4065, 4080 and 4082 Cabinets).
3. If future additions are to be made, store involved
express binder groups in Frame where they will
eventually be used. Wrap express binder groups if
required.
4. Bond and secure cables to Bond Bar per standard
procedure. See Figure 39.
5. Repeat until all cables are bonded and secured.
Figure 37.
Figure 38.
Figure 39.