II. Pedestal Cabinet Installation
and Preparation
A. Cable Preparation
1. Stub and Loop Cable Lengths (See Figure 7)
TABLE I
Stub
Loop
Cabinet
Length Min.
Length Min.
m (ft.)
m (ft.)
0 (00-Pair)
1. ()
2.7 ()
00 (00-Pair)
1. ()
2.7 ()
02 (00-Pair)
1. ()
2.7 ()
0(100-Pair)
2.1 (7)
2.7 ()
0 (2700-Pair)
2.1 (7)
2.7 ()
Carefully remove earth from around cables as follows:
TABLE II
Length
Width
Depth
Cabinet
mm (in.)
mm (in.)
mm (in.)
0 (00-Pair)
0 (12)
7 (1)
7 (1)
00 (00-Pair)
7 (1)
7 (1)
7 (1)
02 (00-Pair)
7 (1)
7 (1)
00 (12)
0 (100-Pair)
1000 (0)
00 (20)
00 (12)
0 (2700-Pair) 100C (0)
00 (20)
00 (12)
NOTE: Uncover cables sufficiently to definitely establish
their location so that anchor stakes will not injure them.
B. Ground Mount Installation
1. MS
2
4065 (300-Pair) Pedestal Cabinet Ground Mount
Installation
a. Carefully remove earth from around cables per Table II.
b. Open doors on Cabinet Assembly. Cabinet has a
removable Hinged Panel and Base Assembly for
easy access.
c. Fill excavation with coarse gravel to within 102 mm
(4") of ground level.
d. Place Cabinet over cables in a vertical position so
that the Cabinet is centered in the excavation.
e. Place Anchor Stake (optional) to rear of Cabinet.
(Protect Stake top with wood block to prevent
damage while driving.) See Figure 8.
f. Using a sledge, drive until Stake top is 406 mm (16")
above ground level as shown in Figure 9.
NOTE: Do not hammer on Cabinet to drive the Stake
into ground.
g. Secure Anchor Stake to rear of Cabinet with the 3/8"
x 1" bolts and nuts provided. See Figure 10.
h. Fill cabinet base with pea gravel to within 102 mm
(4") of top of skirt.
Figure 7.
Figure 8.
Figure 9.
Figure 10.
Summary of Contents for MS2 4000 Series
Page 2: ......
Page 5: ... ...
Page 21: ...21 Figure 46 Figure 47 ...
Page 36: ...36 D Supply Information ...
Page 37: ...37 ...
Page 39: ...39 ...