background image

 

 

IPS7110-2GC-8POE 

Managed Industrial Ethernet Switch 

Quick Installation Guide 

 

3onedata Co., Ltd. 

Address: 

3/B,  Zone  1,  Baiwangxin  High  Technology 

Industrial 

Park, 

Xili, 

Nanshan 

District, 

Shenzhen 

Website: 

www.3onedata.com 

Tel: 

+86 0755-26702688 

Fax: 

+86 0755-26703485 

Package Checklist

 

Please check whether the package and accessories are intact 

while using the switch for the first time.   

1. 

Industrial Ethernet switch 

2. 

Certification 

3. 

Quick installation guide 

4. 

Warranty card 

5. 

DIN-Rail mounting attachment 

6. 

CD 

If any of these items are damaged or lost, please contact our 

company or dealers, we will solve it ASAP.   

Product Overview

 

The product is managed DIN-Rail industrial POE Ethernet 

switch. Model as follows: IPS7110-2GC-8POE (2 Gigabit 

Combo ports + 8 100M POE ports). 

Panel Design

 

 

Top view, Bottom view and Rear view 

 

 

 

Front view and Side view 

 

 

1. 

Power input terminal block 

2. 

Relay alarm output terminal block 

3. 

DIP switch 

4. 

Console port 

5. 

Grounding screw 

6. 

DIN-Rail mounting kit 

7. 

Device running indicator RUN 

8. 

Relay alarm indicator ALM 

9. 

Power supply input status indicator P1/P2 

10. 

POE indicator 

11. 

100M POE copper port 

12. 

100M interface connection indicator 

13. 

Gigabit SFP slot of Combo port 

14. 

Gigabit copper port of Combo port 

15. 

Gigabit Combo port connection indicator 

Mounting Dimension

 

Unit: mm 

 

Note:

 

 

Don't place or install the device in area near water or 

moist, keep the relative humidity of the device 

surrounding between 5%~95% without condensation. 

 

Before power on, first confirm the supported power 

supply specification to avoid over-voltage damaging the 

device. 

 

The device surface temperature is high after running; 

please don't directly contact to avoid scalding. 

DIN-Rail Mounting

 

The product adopts 35mm standard DIN-Rail mounting, which 

is suitable for most of the industrial scenes. Mounting steps as 

below: 

 

Reviews: