background image

 

 

ICS5530-16GS8GC6XS-2P220 

Industrial Layer 3 Ethernet Switch 

Quick Installation Guide 

 

3onedata Co., Ltd.

 

Address: 

3/B,  Zone  1,  Baiwangxin  High  Technology 

Industrial  Park,  Song  Bai  Road,  Nanshan 

District, Shenzhen, 518108, China 

Website: 

www.3onedata.com 

Tel: 

+86 0755-26702688 

Fax: 

+86 0755-26703485 

 

Package Checklist

 

Please check whether the package and accessories are 

intact while using the switch for the first time. 

1. Industrial Ethernet switch 

2. Quick installation guide 

3. Power line x2 (AC   

products only) 

4. Serial port line 

5. Rack-mounting lug x2 

6. Foot pad x4 

7. Software installation CD 

8. Warranty card 

9. Certification 

 

If any of these items are damaged or lost, please contact our 

company or dealers, we will solve it ASAP. 

Product Overview

 

The  product  is  managed  industrial  Ethernet  switch.  The 

model  is  ICS5530-16GS8GC6XS-2P220  (6  10Gigabit  SFP 

(10  Gigabit/Gigabit  self-adaption)  +  8  Gigabit  Combo  +  16 

Gigabit SFP).

 

Panel Design

 

 

Front panel 

 

 

Rear panel 

 

1. 

Ethernet port indicator 

2. 

Gigabit Ethernet SFP 

3. 

1000M Combo port 

4. 

10  Gigabit  SFP  +  port  (10Gigabit  /  Gigabit 

self-adaption) 

5. 

Console port 

6. 

Power indicator (P1/P2) 

7. 

Alarm indicator 

8. 

Device running status indicator 

9. 

Restoring factory setting button 

10.  Lugs 

11.  Relay output terminal blocks 

12.  AC power input 

13.  Grounding screw 

Mounting Dimension

 

Unit: mm 

 

Notice before mounting:

 

 

Don't place or install the device in area near water or 

moist,  keep  the  relative  humidity  of  the  device 

surrounding between 5%~95% without condensation. 

 

Before  power  on,  first  confirm  the  supported  power 

supply  specification  to  avoid  over-voltage  damaging 

the device. 

 

The  device  surface  temperature  is  high  after  running; 

please don't directly contact to avoid scalding. 

Rack-mounted

 

This product adopts rack-mounting, mounting steps as 

below: 

Step 1

 

Select  the  device  mounting  location  to  ensure 

enough size. 

Step 2

 

Adopt  4  bolts  to  install  the  mounting  lugs  in  the 

device position as figure below. 

 

Reviews: