【
DIN-Rail Mounting
】
The product adopts 35mm standard DIN-Rail mounting which
is suitable for most industrial scenes, mounting steps as
follows:
Step 1
Check if the DIN-Rail mounting kit is installed firmly.
Step 2
Insert the bottom of DIN-Rail mounting kit (one side
with spring support) into DIN-Rail, and then insert
the top into DIN-Rail.
Tips:
Insert a little to the bottom, lift upward and then insert
to the top.
Step 3
Check and confirm the product is firmly installed on
DIN-Rail, then mounting ends.
【
Disassembling DIN-Rail
】
Step 1
Power off device.
Step 2
After lifting the device upward slightly, first shift out
the top of DIN-Rail mounting kit, and then shift out
the bottom of DIN-Rail, disassembling ends.
Notice:
Don't place or install the device in area near water or
moist, keep the relative humidity of the device
surrounding between 5%~95% without condensation.
Before power on, first confirm the supported power
supply specification to avoid over-voltage damaging the
device.
The device surface temperature is high after running;
please don't directly contact to avoid scalding.
【
Power Supply Connection
】
12~48VDC power supply
Model I, VI, VIII devices of this series support
DC power input, and provide 3-pin terminals
with a spacing of 7.62 mm. The power supply
has non-polarity function. Voltage range:
12~48VDC. The pin definitions of power supply are shown as
follows:
PIN
1
2
3
Definition
V+
FG
V-
48VDC power supply
Model III, IV, V devices of this series support
DC power input, and provide 3-pin terminals
with a spacing of 7.62 mm. The power
supply has anti-reverse connection function.
Support 48V PoE, power range: 48VDC (44~55VDC). The pin
definitions of power supply are shown as follows:
PIN
1
2
3
Definition
V+
FG
V-
AC power supply
Model II, VII, IX devices of this series support
AC power input, and provide 3-pin terminals
with a spacing of 7.62 mm. Power supply
value range is: 220VAC (100~240VAC). The
pin definitions of power supply are shown as follows:
PIN
1
2
3
Definition
L
FG
N
Notice:
Power ON operation: First insert the power supply
terminal block into the device power supply interface,
and then plug the power supply plug contact and power
on.
Power OFF operation: First, remove the power plug,
and then remove the wiring section of terminal block.
Please pay attention to the above operation sequence.
【
DIP Switch Settings
】
This series provide 4-pin DIP switch for function
setting, where "ON" is the enabled end. DIP
switches definition as follows:
DIP Definition
Operation
1
Jumbo frame Set the DIP to ON to enable jumbo
frame function
2
Flow Control
Set the DIP to ON to enable flow
control function
3
One-key
VLAN
Set the DIP to ON to enable VLAN
function.
Model I-Model III: copper port
1 is interconnected with other
interfaces, and other ports
except copper port 1 are
isolated from each other.
Model IV- Model IX: fiber port
(5 ports
)
port is interconnected
with other interfaces, and
other ports except fiber ports
are isolated from each other.
4
Port 100M
Set the DIP to ON, port rate would
be forced to be in 100M
[Checking LED Indicator]
The device provides LED indicators to monitor the device
working status with a comprehensive simplified
troubleshooting; the detailed status of each LED is described
in the table as below:
LED
Indicate Description
PWR
ON
PWR is connected and