Controller Object Commands
www.3ware.com
43
If you then enable the rebuild schedules, the unit initialization will be paused
until the next scheduled time slot, as reflected in the examples below:
//localhost> /c1 set rebuild=enable
Enabling scheduled rebuilds on controller /c1 ...Done.
//localhost> /c1 show rebuild
Rebuild Schedule for Controller /c1
========================================================
Slot Day Hour Duration Status
--------------------------------------------------------
1 Mon 2:00pm 10 hr(s) enabled
2 Thu 7:00pm 18 hr(s) enabled
3 - - - -
4 - - - -
5 - - - -
6 Mon 1:00am 4 hr(s) enabled
7 Sun 12:00am 1 hr(s) enabled
//localhost> /c1 show
Unit UnitType Status %Cmpl Stripe Size(GB) Cache AVerify IgnECC
--------------------------------------------------------------------------
u0 RAID-5 INIT-PAUSED 0 64K 521.466 ON OFF OFF
Port Status Unit Size Blocks Serial
---------------------------------------------------------------
p0 NOT-PRESENT - - - -
p1 OK u0 76.33 GB 160086528 Y2NXL7FE
p2 NOT-PRESENT - - - -
p3 OK u0 76.33 GB 160086528 Y2NXLB9E
p4 NOT-PRESENT - - - -
p5 OK u0 76.33 GB 160086528 Y2NXQPZE
p6 NOT-PRESENT - - - -
p7 OK u0 76.33 GB 160086528 Y2NXM4VE
p8 OK u0 74.53 GB 156301488 3JV3WTSE
p9 OK u0 74.53 GB 156301488 3JV3WRHC
p10 OK u0 74.53 GB 156301488 3JV3WQLQ
p11 OK u0 74.53 GB 156301488 3JV3WQLZ
/cx show verify
9000 series controllers support background tasks and allow you to schedule a
regular time when they occur.
Verify is one of the supported background tasks. Rebuild and selftest are other
background tasks for which there are separate schedules. Migrate and
initialize are additional background tasks that follow the same schedule as