background image

APPLY IN A WARM, DRY ENVIRONMENT. ENSURE SURFACES & HANDS ARE GREASE FREE.      REMOVE BY GENTLY HEATING WITH A 

HAIR DRYER. MEASURE TWICE, STICK ONCE! CURE FOR 24 HOURS.

Push out hole plugs using a blunt tool.

Secure in place using supplied 

screws and 3mm allen key.

Align bracket with flat edge toward the 

front.

Insert spine washer inside bag.

Puncture through chosen holes and 

install screws using allen key.

Slide onto bag.

(Removal may require alot of force)

Place on bike. Mark a line.

Slide bracket off (may require alot of force)

Apply adhesive pad firmly 

pressing all areas.

Mark a centre line on top 

tube.

Peel back film, align front 

edge and press firmly.

Ensure alignment, pull 

away the rest of the film 

and press firmly.

For non uniform and narrow 

tubes we advise to hold in 

place with tape whilst 

curing. 

BIKE SLIDER

 - BIKE SIDE DIRECT MOUNT

BAG SLIDER

 - BAG SIDE

BIKE SLIDER 

- BIKE SIDE STICK ON

SNAP!

Reviews: