APPLY IN A WARM, DRY ENVIRONMENT. ENSURE SURFACES & HANDS ARE GREASE FREE. REMOVE BY GENTLY HEATING WITH A
HAIR DRYER. MEASURE TWICE, STICK ONCE! CURE FOR 24 HOURS.
Push out hole plugs using a blunt tool.
Secure in place using supplied
screws and 3mm allen key.
Align bracket with flat edge toward the
front.
Insert spine washer inside bag.
Puncture through chosen holes and
install screws using allen key.
Slide onto bag.
(Removal may require alot of force)
Place on bike. Mark a line.
Slide bracket off (may require alot of force)
Apply adhesive pad firmly
pressing all areas.
Mark a centre line on top
tube.
Peel back film, align front
edge and press firmly.
Ensure alignment, pull
away the rest of the film
and press firmly.
For non uniform and narrow
tubes we advise to hold in
place with tape whilst
curing.
BIKE SLIDER
- BIKE SIDE DIRECT MOUNT
BAG SLIDER
- BAG SIDE
BIKE SLIDER
- BIKE SIDE STICK ON
SNAP!