Operating and Assembly Instructions – A.B.S. Flexilo
TROUGH for wood pellets
Final inspection
Subject to technical change
Issue 09/2016
Page 18 of 33
©A.B.S. Silo- und Förderanlagen GmbH
Assembly of the plug-in elements
Assemble the steel frame until all top and base connectors as well as the drawing
irons are connected.
Assembly of the frame construction
Hint: Support the frame feet with draw bars
on the ground (see picture)
Head plate of middle support on middle
support