Operating and Assembly Instructions – A.B.S. Flexilo for wood pellets
Assembly
Subject to technical change
Issue 09/2016
Page 22 of 30
©A.B.S. Silo- und Förderanlagen GmbH
Attaching the filling set
5.7 Assembling discharge unit
Assemble the discharge unit, which is included in the scope of delivery corresponding to the
assembly and operation instructions of the conveying spiral U-TROG.
When the silo is filled the removal system should have a ground clearance. During the first
filling process the silo extend. By continuing of the filling the discharge unit will additionally lift
up depending of the silo size, because during the filling the sides of the silo bag will be
pressed outwards.
Generally should the discharge units NOT fixed on the ground, so that the silo has the
possibility to lift up and come down.
At first lay down together all the parts for the trough, as they have to be fixed together. After
this bolt the parts together. If the trough is now complete assembled bolt the complete trough
with the help of the terminal strips on the silo.
Note: Put the trough on a pallet or something similar, this makes it easier to fix the trough on
the silo (see picture).
This step can be changed with 5.8 according to the structural conditions.
You must pull the filler neck in the silo cover over the filling pipe as far as possible
in order to keep the pellets from striking the seam during filling.