Furnace Installation and Owners Manual
5
LDJ620_E01_R03_2006.03
Models LDJ620-9 and LDJ620-10
I
N S T A L L A T I O N
A N D
L
O C A T I O N
C
O N S I D E R A T I O N S
Failure to install the A-MAIZE-ING HEAT
®
furnace according to the
guidelines and instructions contained within this manual may result in
serious injury or death, property damage, or voiding of the warranty.
Installation Configurations
IMPORTANT: The A-MAIZE-ING HEAT
®
furnace is designed for use as a primary heat
source furnace. It should be installed with its
metal hot air plenum connected to the hot air
duct work, and its metal cold air joined to the
return air system.
This unit is not intended to be an add-on unit
to another furnace. If you intend to use the A-
MAIZE-ING HEAT
®
furnace in conjunction with
another furnace, air back-feed prevention
measures must be taken to prevent the
overheating of either furnace.
Furnace Clearances and Accessibility
The following are the minimum distances the
furnace may be to a combustable surface:
top ......................................................................... 32"
either side ............................................................... 6"
front ....................................................................... 30"
rear-most surface on back (furnace or flue) .......... 18"
For ease of service, the following minimum
distances are recommended:
top ......................................................................... 32"
side opposite bin ................................................... 24"
front....................................................................... 36"
rear-most surface on back (furnace or flue).......... 18"
12"
7"
18" (**)
41"
36" (*)
24" (*)
22"
35"
51"
*Minimum service distance
**Minimum combustable clearance