NRP620-10 OMEPAPV20161017 (ENGLISH) REV 1
Page 17 of 42
FURNACE UNPACKING AND SET UP
Your furnace was shipped from the factory with a “FURNACE PACKAGE” packing list. That document
includes the part number and serial number. Locate that list and check the contents of the packaging
to ensure all items were delivered. The items you will have are in the list below.
A.
FURNACE
B.
HOPPER (Model 14 or Wedge 200)
C.
HOPPER LID
D.
HOPPER LEGS AND CROSS BEAMS (Model 14 hopper only)
E.
HIGH FIRE TIMER (SET @ 30 SEC. ON AND 30 SEC. OFF)
F.
LOW FIRE TIMER (SET @ 2 MIN. ON 12 MIN. OFF)
G.
DRAFT CONTROL WITH COLLAR
H.
FURNACE PARTS BAG (INCLUDES: wooden handles x 4, orange wire nuts x 3, Owner’s
Manual, First Light Notice)
I.
HOPPER HARDWARE BAG (Model 14 hopper only) (INCLUDES: 5/16” X ½” hex head
cap screws x 16, 5/16” hex nuts x 16, 10 X 3/4” self-tapping screws x 2)
J.
BURNPOT AUGER (already installed)
K.
BIN AUGER (already installed on Wedge 200)
L.
FILTER (already installed)
M.
POKER
N.
HOSE CLAMP (secured to flex tube on Model 14 Bin)
O.
VIBRATOR (not applicable with the Wedge 200, already installed on Model 14 Bin)
1.
After removal of shipping materials, remove the furnace from the pallet by removing the three
shipping screws securing the furnace to the pallet. One (1) screw is accessible by removing the
filter door. The remaining two (2) are removed from under the pallet.
2.
Remove the Furnace Assembly Package from the combustion chamber.
3.
Slide wooden handles on door handle, door safety handle, and heat exchanger scraper rod.