probe is not supplied with the GB models.  A tank probe can be
used as an option to control loop temperature and unit staging.
Additionally, the Inlet Temperature Probe can be used as the loop
thermostat in some heating (GB) applications.  These types of
controls connect to designated wires in the junction box at the rear
of the boiler.  

Do not operate this boiler using the internal high

limits only, you must use an operating thermostat as mentioned
above.

Note:  Additional 24V devices or Tank Probe must be identified
using Dip Switches on Central Control Board before they are
recognized as a part of the heating system.  See table 5 and refer to
"Multi-Stage Firing and Control System" on previous page for more
information about dip switch settings.

CIRCULATING PUMP

The pump flow rate should not exceed the maximum
recommended flow rate, see table 4.

FOR HOT WATER SUPPLY SYSTEMS (GW models)

, ordered with

the circulator as an integral part of the boiler; the pump has been
lubricated at the factory, and future lubrication should be in
accordance with the motor manufacturer's instructions provided
as supplement to this manual.

FOR HOT WATER HEATING SYSTEMS (GB models or GW models
ordered without circulator)

, the circulator is NOT provided and

must be field-installed.

LOW WATER CUTOFF (Not Supplied)

If low water protection is required by the authorities having
jurisdiction, a low water cutoff switch should be installed
next to the boiler in the outlet water line as shown in
"HYDRONIC INSTALLATION" section.  The switch should receive
periodic (every six months) inspection to assure proper operation.
A low water cutoff device of the float type should be flushed every six
months.

DRAIN VALVE (Not Supplied)

Additional drain valves must be obtained and installed on each
boiler and tank for draining purposes.

SAFETY RELIEF VALVES

Your local code authority may have other specific relief valve
requirements not covered below.

 

 

WARNING

THE PURPOSE OF A SAFETY RELIEF VALVE IS TO AVOID
EXCESSIVE PRESSURE WHICH MAY CAUSE TANK EXPLOSION,
SYSTEM OR BOILER DAMAGE.

TO AVOID WATER DAMAGE A DRAIN LINE MUST BE CONNECTED
TO A SAFETY RELIEF VALVE TO DIRECT DISCHARGE TO A SAFE
LOCATION.  A DRAIN LINE MUST NOT BE REDUCED FROM THE
SIZE OF THE VALVE OUTLET AND IT MUST NOT CONTAIN ANY
VALVES BETWEEN THE BOILER AND THE RELIEF VALVE OR THE
RELIEF VALVE AND THE DRAIN EXIT.  IN ADDITION, THERE
SHOULD NOT BE ANY RESTRICTIONS IN A DRAIN LINE NOR
SHOULD IT BE ROUTED THROUGH AREAS WHERE FREEZING
CONDITIONS MIGHT OCCUR.  DO NOT THREAD OR CAP THE
DRAIN LINE EXIT.  RESTRICTING OR BLOCKING A DRAIN LINE
WILL DEFEAT THE PURPOSE OF THE RELIEF VALVE AND MAY
CREATE AN UNSAFE CONDITION.  INSTALL A DRAIN LINE WITH
A DOWNWARD SLOPE SUCH THAT IT NATURALLY DRAINS
ITSELF.

If any safety relief valve is replaced, the replacement valve must
comply with the latest version of the ASME Boiler and Pressure
Vessel Code, Section IV (HEATING BOILERS).  Select a relief valve
with a discharge rating NOT less than the boiler input, and a set
pressure NOT exceeding the working pressure of any component
in the system.

The storage tank temperature and pressure relief valve must
comply with the applicable construction provisions of the Standard
for Relief Valves and Automatic Gas Shut-off Devices for Hot Water
Supply Systems, ANSI Z21.22 or CSA-4.4 (and latest addendums).
The valve must be of the automatic reset type and not embody a
single-use type fusible plug, cartridge or linkage.

FOR HOT WATER HEATING SYSTEMS, the boilers are shipped
with a 50 psi pressure relief valve.  This relief valve is factory
installed in the water outlet header of the boiler, see figure 1.

FOR  HOT WATER SUPPLY SYSTEMS,  the boilers are shipped
with a 125 psi pressure relief valve.  This relief valve is factory
installed in the water outlet header of the boiler, see figure 1.

This ASME-rated valve has a discharge capacity that exceeds the
maximum boiler input rating and a pressure rating that does not
exceed the maximum working pressure shown on the boiler rating
plate.

In addition, an A.G.A. design-certified and ASME-rated temperature
and pressure (T & P) relief valve must be installed on each and
every water storage tank in the hot water supply system, see
figures 11 and 13.

The T & P  relief  valve should have a temperature rating of  210°F
(99°C), a pressure rating NOT exceeding the lowest rated working
pressure of any system component, and a discharge capacity
exceeding the total input of the water boilers supplying water to the
storage tank.

Locate the T & P relief valve (a) in the top of the tank, or (b) in the
side of the tank on a center line within the upper six (6) inches
(15 cm) of the top of the tank.  The tapping shall be threaded in
accordance with the latest edition of the Standard for Pipe Threads,
General Purpose (inch), ANSI/ASME B1.20.1.  The location of, or
intended location for, the T & P relief valve shall be readily
accessible for servicing or replacement.

INSTALLATION INSTRUCTIONS

REQUIRED ABILITY

INSTALLATION OR SERVICE OF THIS BOILER REQUIRES ABILITY
EQUIVALENT TO THAT OF A LICENSED TRADESMAN IN THE
FIELD INVOLVED.  PLUMBING, AIR SUPPLY, VENTING, GAS
SUPPLY AND ELECTRICAL WORK ARE REQUIRED.

LOCATION

When installing the boiler, consideration must be given to proper
location.  Location selected should be as close to the stack or
chimney as practical with adequate air supply and as centralized
with the piping system as possible.  This location should also be
such that the gas ignition system components are protected from
water (dripping, spraying, etc.) during appliance operation and
service (circulator replacement, control replacement, etc.)

Summary of Contents for 200 Series

Page 1: ...installation and or operation of this boiler Please pay particular attention to the important safety and operating instructions as well as the WARNINGS and CAUTIONS CONTENTS PAGE ROUGH INDIMENSIONS CA...

Page 2: ...Type of Gas Inches W C kPa Volts Hz Amperes GW GB 1000 thru 2500 NATURAL 3 5 0 87 120 60 30 GW GB 1000 thru 2500 PROPANE 10 2 49 120 60 30 All Models Maximum Supply Pressure 14 0 In W C 3 49 kPa Mini...

Page 3: ...2 27 7 33 3 38 8 44 4 50 55 5 61 1 66 7 72 2 GW 1000 990 000 290 1 LPH 9526 7620 6350 5443 4763 4234 3810 3462 3175 2930 GPH 2520 2016 1680 1440 1260 1120 1008 916 840 775 GW 1300 1 300 000 380 9 LPH...

Page 4: ...d by a rate of 4 for each 1 000 feet 300 m above sea level FOREWORD These designs comply with the latest edition of the American National Standards for Gas Fired Low Pressure Steam and Hot Water Boile...

Page 5: ...ignition trials the boiler will lock out Upon lockout manually push the ENTER RESET button on the display panel to restart the boiler WATER FLOW SWITCH The Water Flow Switch is installed at the boiler...

Page 6: ...SUCH THAT IT NATURALLY DRAINS ITSELF If any safety relief valve is replaced the replacement valve must comply with the latest version of the ASME Boiler and Pressure Vessel Code Section IV HEATING BO...

Page 7: ...waxes and process chemicals are typical compounds which are corrosive These materials are corrosive at very low concentration levels with little or no odor to reveal their presence Products of this s...

Page 8: ...1 square inch per 14 000 BTU in excess of 1 000 000 BTUH This opening s shall be located at or ducted to a point neither more than 18 46 0 cm nor less than 6 inches 15 2 cm above the floor level Where...

Page 9: ...he combustion process horizontal terminations must not be located over areas of pedestrian or vehicular traffic i e public walkways or over areas where condensate could create a nuisance or hazard Thi...

Page 10: ...ortion of the vent shall be supported to maintain clearances and to prevent physical damage or separation of joints TABLE 7 STANDARD VERTICAL VENTING CATEGORY I Extending venting over 70 feet 21 3 m m...

Page 11: ...special gas vent pipes listed for use with Category III gas burning heaters such as stainless steel Saf T Vent by Heat Fab Inc available from A O Smith WPC 5621 W 115th Street Alsip IL 60803 Phone 1 8...

Page 12: ...boiler to the vent terminal The horizontal portion of the vent shall be supported to maintain clearances and to prevent physical damage or separation of joints Figure 7 APPLIANCE CERTIFIED EXHAUSTVENT...

Page 13: ...800 433 2515 Pipe joints must be positively sealed TABLE 10 DIRECT VENT HORIZONTAL EXHAUST CONFIGURATIONS Figure 8 APPLIANCE CERTIFIED VENT MAXIMUM AIRINTAKE AIRINLET MAXIMUM MODEL CATEGORY EXHAUSTVEN...

Page 14: ...he Installed vent be airtight Please insure that all joints are sealed properly during installation DIRECTVENTVERTICALANDHORIZONTALVENTING For direct vent applications this boiler may be vented accord...

Page 15: ...minimum pressure drop for several circuits manifolds should be larger than system loops SYSTEM INSTALLATION GENERAL If the system is to be filled with water for testing or other purposes during cold w...

Page 16: ...g that is desired A single boiler installation might be controlled directly from space temperature thermostat s Multiple boiler installations are more effective when the boilers are sequenced in and o...

Page 17: ...ance loop must be installed see figures 11 and 13 HARD WATER CONDITIONS Where hard water conditions exist water softening or the threshold type of water treatment is recommended This will protect the...

Page 18: ...l tank IMPORTANT SAFETY FLOW SWITCH PROTECTS THE BOILER IN CASE OF WATER SERVICE INTERRUPTION OR CIRCULATOR FAILURE PIPE TO OPEN DRAIN X FACTORY INSTALLED ON UNIT SUPPLIED WITH UNIT FIELD INSTALLED IN...

Page 19: ...ED DANGER TEMPERATURE SETTING SHOULD NOT EXCEED SAFE USE TEMPERATUREAT FIXTURES SEE WATER TEMPERATURE CONTROL WARNING ON PAGE 23 IF HIGHER PREHEAT TEM PERATURES ARE NECESSARY TO OBTAIN ADEQUATE BOOSTE...

Page 20: ...92 2 841 2 577 2 372 2 197 2 109 1 962 1 757 1 611 1 464 1 347 Length of Pipe in Feet Metres Nominal Iron Pipe Size Cap 10 Ft 20 Ft 30 Ft 40 Ft 50 Ft 60 Ft 70 Ft 80 Ft 90 Ft 100 Ft 125 Ft 150 Ft 175 F...

Page 21: ...ted Rating Input Number of Model BTUH Burners Natural Holes Propane Holes GB GW 1000 990 000 10 0 111 4X 0 071 3X GB GW 1300 1 300 000 13 0 111 4X 0 071 3X GB GW 1500 1 500 000 15 0 111 4X 0 071 3X GB...

Page 22: ...th a 10 amp fuse located inside the control box Note Four extra 3 amp fuses and one 5 amp fuse are supplied with the boiler Recommended Replacement fuses 3 Amp Littlefuse automotive fuse PN 257003 5 A...

Page 23: ...ssure should read 10 W C IMPORTANT UNDER NO CIRCUMSTANCES SHALL THE GAS PRESSURE MEASUREDATTHE BURNER MANIFOLD EXCEED THAT STATED ON THE BOILER RATING PLATE OVERFIRING WILL RESULT IN DAMAGE TO THE BOI...

Page 24: ...5 MINUTES TO CLEAR OUTANYGAS THEN SMELLFORGAS INCLUDINGNEARTHEFLOOR IFYOU SMELLGAS 1 SET THE SYSTEM CONTROLLER TO THE LOWEST SETTING 2 TURN POWER SWITCH ON APPLIANCE TO OFF POSITION 3 REMOVEACCESS PAN...

Page 25: ...FIEDSERVICE TECHNICIAN TO INSPECT THE APPLIANCE AND TO REPLACEANYPARTOFTHECONTROLSYSTEMANDANY GASCONTROLWHICHHASBEENUNDERWATER E DO NOT OPERATE APPLIANCE UNLESS UNIT IS FILLED WITH WATERAND WATER LINE...

Page 26: ...TER RESET enable the user to adjust set points differentials post circulate time reset the cycle count and reset the control system during lock out Changes made to programmable features are stored in...

Page 27: ...rature Set point Value Set Appliance Stage Switching Differential Value Select Appliance Post Circulate Time Check Appliance Cycle Count View Last Error Encountered by Control Control the water temper...

Page 28: ...n on the display screen when the OUTLET LED is illuminated The red wires control the ECO Emergency Cutoff which shuts down the unit if the water temperature exceeds 250 F 121 C and requires a manual r...

Page 29: ...see the section labeled Procedure for Setting Stage Differential Procedure for Setting Stage Differential Once the system control and set point temperature has been entered the switching differentials...

Page 30: ...set the cycle count to zero press the ADJUST push button Press the ENTER RESET push button to successfully reset the cycle count If the ENTER push button is not pressed the reset function will not be...

Page 31: ...excessive lifting of flame from burner ports see Figure 17 If the preceding burner characteristics are not evident check for accumulation of lint or other foreign material that restricts or blocks the...

Page 32: ...rviceman should follow this procedure when the boiler s intake and exhaust piping need cleaning 1 Turn off the electrical power and manual gas shut off Allow boiler parts to cool before disassembly 2...

Page 33: ...16 red fault LED indicators to help pinpoint the source of failures In addition the display will inform the user on which stage the failure occurred by illuminating a red Stage LED In cases where the...

Page 34: ...RD STAGE 3 013 HARD STAGE 4 014 HARD LWCO 020 HARD CIRCULATE FAULT FLOW SWITCH 030 SOFT INSUFFICIENT AIR AIR PRESSURE SWITCH STAGE 1 041 SOFT STAGE 2 042 SOFT STAGE 3 043 SOFT STAGE 4 044 SOFT BLOCKED...

Page 35: ...ties including any warranty of merchantability imposed on the sale of this boiler under state law are limited to one 1 year duration for the boiler or any of its parts Some states or provinces do not...

Page 36: ...36 REPLACEMENT PARTS 5621 W 115TH STREET ALSIP IL 60803 Phone 800 433 2545 Fax 800 433 2515 www hotwater com E Mail parts hotwater com...

Reviews: