47
N
OTES
:
1.
P
re
ferred
piping
diagram
.
2.
The
tempera
ture
and
pre
ssure
relie
f valve
se
tting
shall
no
t exceed
pressure
ra
ting
o
f any
componen
t in
the
sys
tem
.
3.
S
ervi
ce
val
ves
are
shown
for
servicing
uni
t.
Howeve
r,
local
codes
s
hall
govern
their
usage
.
4.
A. O. S
mi
th
piping
me
thod
is
based
on
50
equivalen
t f
ee
t o
f piping
. B
oiler
placemen
t shall
be
as
close
as
prac
tical
to
th
e
st
orage
tan
k.
A
ppli
ca
tion
s
in
e
xcess
o
f t
hese
recommenda
tions
shall
require
a
licensed
engineer
for
design
assis
tance
.
BURK
AY
HW(300-670) -
ONE
TEMPER
ATURE-ONE BOILER/VE
R
TICA
L S
TORAGE
T
ANK
RECOVE
R
Y SYSTEM
LEGEND
TEMPER
ATURE & PRESSURE
RELIEF
VA
LVE
PRESSURE RELIEF
VA
LVE
CIRCUL
ATING PUMP
TA
NK
T
EM
PER
AT
URE
C
O
N
TR
O
L
DRAIN
FUL
L PO
R
T BAL
L
VA
LVE
TEMPER
ATURE GAGE
W
ATER FLOW SWITCH
CHECK
VA
LVE
W
ARNING:
THIS DR
AWING SHOWS SUGGESTED
PIPING CONFIGUR
AT
ION
AND OTHER DEVICES;
CHECK WITH LOCA
L CODES
AND ORDINANCES
FOR
ADDITIONA
L REQUIREMENTS.
EXPANSION TANK
COLD WATER SUPPLY
SYSTEM RETURN
AOS
STORAGE TANK
ALTERNATE COLD WATER CONNECTION FOR OLD STYLE TANK
HOT WATER TO FIXTURES
DE-LIMING TEE
FINISHED FLOOR
FIGURE
29.
ONE TEMPERA
TURE - ONE BOILER/ VERTICAL
ST
ORAGE T
ANK RECOVER
Y SYSTEM
PIPING DIAGRAMS