55
FIGURE
37.
THREE BOILERS PRIMAR
Y/ SECONDAR
Y HYDRONIC PIPING SYSTEM
N
OTES
:
1.
Pre
ferred
piping
la
you
t.
2.
The
tempera
ture
and
pre
ssure
relie
f valve
se
tting
shall
no
t exceed
pressure
ra
ting
o
f any
componen
t in
the
sys
tem
.
3.
Servi
ce
v
al
ves
are
s
hown
for
servicing
boile
r.
Howeve
r,
local
codes
shall
govern
their
usage
.
4.
A. O. S
mi
th
piping
me
thod
is
based
on
50
equivalen
t f
ee
t o
f piping
. B
oiler
placemen
t shall
be
as
close
as
prac
tical
to
th
e
hea
ting
loop
. A
ppli
ca
tions
in
e
xc
es
s
of t
hese
recommenda
tions
shall
require
a
licensed
engineer
for
design
assis
tance
.
HW
B
URK
AY
BOILER
(30
0-
670)
-
THREE BOILERS PRIMA
R
Y/SECONDA
R
Y
HYDRONIC PIPING SYSTEM
LEGEND
TEMPER
ATURE & PRESSURE
RELIEF
VA
LVE
PRESSURE RELIEF
VA
LVE
CIRCUL
ATING PUMP
TE
M
PER
AT
URE
C
O
N
TR
O
L
PR
O
BE
DRAIN
FUL
L PO
R
T BAL
L
VA
LVE
TEMPER
ATURE GAGE
W
ATER FLOW SWITCH
CHECK
VA
LVE
CAUTION:
THIS DR
AWING SHOWS SUGGESTED
PIPING CONFIGUR
ATION
AND OTHER DEVICES;
CHECK WITH LOCA
L CODES
AND ORDINANCES
FOR
ADDITIONA
L REQUIREMENTS.
HW BOILER
BOILER PIPING SIZE “A” (INCH)
MANIFOLD PIPING SIZE “B” (INCH)
30
0
1.25
”
2.50”
399-42
0
1.50
”
2.50”
520-67
0
2.00
”
3.00”
A
A
A
B
EX
PANSION
T
ANK
MAKE-UP W
ATER
AIR SE
PAR
AT
OR
SYSTEM SUPP
LY
SYSTEM PUMP
SYSTEM RETURN
PLACES
TEES
AS CLOSE
TOGETHER
AS PRACTICAL
LOO
P
TEMPER
ATURE PROBE
FINISHED FLOOR