9.
Make sure the gas supply pressure is correct, refer to Gas supply pressure (see
8.9.3).
10. Make sure the CO
2
value is correct, refer to CO
value (see 8.9.4).
11.2
Preparation
Isolate the water heater from the mains (see 4.3.2) before you start maintenance tasks.
11.3
Water-side maintenance
To do water side maintenance:
•
Descale the tank (see 11.3.1)
•
Clean the condensate drain (see 11.3.2)
11.3.1
Descale the tank
Note
Hard water may cause the formation of limescale, which will reduce the operating
efficiency and may cause early product failure. Failure of the water heater due to
limescale or other deposits would not be classed as manufacturing defect and as such
would not be covered under the terms of the warranty (on page 3).
To descale and clean the tank:
1.
Decommision the water heater (see 8.10).
2.
Remove the cover plate (5) on the bottom of the front of the tank.
3.
Remove the isolating material to see the cleaning opening.
4.
Loosen the 6 bolts (4).
5.
Remove the cleaning opening cover (3).
6.
Remove the gasket (2).
7.
Inspect the tank and remove the loose scale deposits and contamination:
a)
Remove the scale and contamination by hand.
b)
If necessary use a descaling agent to remove the scale and contamination.
Contact the supplier of your water heater for advice on what descaling agent to
use.
8.
Replace the gasket.
9.
Close the cleaning opening.
Use a torque wrench to tighten the bolts with a maximal torque of 50 Nm to prevent
damage to the tank
10. Fill the water heater (see 8.9.1).
Fig. Cleaning opening
1
2
3
4
5
1. Cleaning opening
2. Gasket
3. Cleaning opening
cover
4. Bolts
5. Magnetic cover plate
n
64
Installation, Maintenance and Service part
Summary of Contents for Innovo IR 12-160
Page 6: ...6 ...
Page 13: ...User part 0312266_INNOVO_UKUK_V5 1 2022 07 12 13 ...
Page 14: ...14 ...
Page 16: ...16 User part ...
Page 18: ...18 User part ...
Page 24: ...24 User part ...
Page 27: ...Installation Maintenance and Service part 0312266_INNOVO_UKUK_V5 1 2022 07 12 27 ...
Page 28: ...28 User part ...
Page 36: ...36 Installation Maintenance and Service part ...
Page 56: ...56 Installation Maintenance and Service part ...
Page 58: ...58 Installation Maintenance and Service part ...
Page 70: ...70 Installation Maintenance and Service part ...
Page 83: ...0312266_INNOVO_UKUK_V5 1 2022 07 12 83 ...
Page 87: ...13 4 Electrical wiring diagram 0312266_INNOVO_UKUK_V5 1 2022 07 12 87 ...
Page 89: ...13 5 Declaration of conformity 0312266_INNOVO_UKUK_V5 1 2022 07 12 89 ...
Page 90: ......
Page 91: ......
Page 94: ...92 Installation Maintenance and Service part ...