Instruction manual SGS
27
is
3.6.3
Circulation pipe
See (C) in the installation diagram
(3.5 "Installation diagram")
.
If an immediate flow of hot water is required at draw-off points, a circulation
pump can be installed. This improves comfort and reduces water wastage.
1. Fit a circulation pump (6) of the correct capacity for the length and resistance
of the circulation system.
2. Fit a non-return valve (5) behind the circulation pump to guarantee the
direction of circulation.
3. Fit two stop valves for service purposes (4).
4. Connect the circulation pipe up to a connection of the storage tank.
3.7
Water connections,
Unvented
Warning
The installation should be carried out by an authorised installation engineer,
in compliance with general and local regulations
(1.3 "Regulations")
.
3.7.1
Cold water side
See (A) in the installation diagram
(3.5 "Installation diagram")
.
1. Fit an approved stop valve (4) on the cold water side as required by
applicable regulations
(1.3 "Regulations")
.
2. The maximum working pressure of the appliance is 8 bar. Because the
pressure in the water pipe at times can exceed 8 bar, you must fit an
approved pressure-reducing valve (1).
3. Fit a non-return valve (5) and an expansion vessel (16).
4. Fit an expansion valve (15) and connect the overflow side to an open
wastewater pipe.
3.7.2
Hot water side
See (B) in the installation diagram
(3.5 "Installation diagram")
.
Note
Insulating long hot water pipes will prevent unnecessary energy loss.
1. Optional: fit a temperature gauge (12) so you can check the temperature of
the tap water.
2. Fit the T&P valve (3).
3. Fit a stop valve (11) in the hot water outlet pipe for servicing.
3.7.3
Circulation pipe
See (C) in the installation diagram
(3.5 "Installation diagram")
.
If an immediate flow of hot water is required at draw-off points, a circulation
pump can be installed. This improves comfort and reduces water wastage.
1. Fit a circulation pump (6) of the correct capacity for the length and resistance
of the circulation system.
2. Fit a non-return valve (5) behind the circulation pump to guarantee the
direction of circulation.
3. Fit two stop valves for service purposes (4).
4. Connect the circulation pipe up to a connection of the storage tank
Summary of Contents for SGS - 100
Page 1: ...80 100 Installation User and Service Manual Installation User and Service Manual...
Page 2: ...www aosmithinternational com your installer...
Page 4: ...4 Instruction manual SGS gis...
Page 8: ...Table of contents 8 Instruction manual SGS...
Page 12: ...Introduction 12 Instruction manual SGS 1 gis...
Page 44: ...Installation 44 Instruction manual SGS 3 is...
Page 62: ...Shutting down 62 Instruction manual SGS 10 gis...
Page 92: ...Maintenance frequency 92 Instruction manual SGS 14 is...
Page 101: ...Instruction manual SGS 101 is...
Page 106: ...Appendices 106 Instruction manual SGS 17 is...