6
Installation Instructions
Installation Parts
• Aquatic 2 Ozone Generator
• Aquatic 2 user manual
• 1 check valve
• 5 feet of tubing
• 4 hose ties
• 2 screws and plastic anchor for mounting
Required Installation Tools and Materials
• Phillips screwdriver
• Pliers
Unit Assembly
• The Aquatic 2 is pre-assembled and ready to install.
Mounting
• Mount the ozone generator as high as possible.
• Screws are provided for mounting but may not be appropriate for all
surfaces. Substitute proper mounting hardware as required.
Electrical
• Test the GFCI breaker.
• Connect the Aquatic 2 cord to the mating connector(s) on the control
box according to the provided A2Z OzoneTM wiring diagram in Figure
2.
• Where possible, route the power cord away from other electrical
lines. Do not run the power cord parallel to any low voltage signal
wires. Secure the power cord to prevent damage.