background image

5

Transport 

Deliveries are to be immediately checked in the presence of the carrier as being intact and complete. 
Units must be properly transported. Improper transport can lead to:

•  Impeller interference with inlet ring
•  Motor shaft deformation
•  Bearing damage

Unpacking 

•  Carefully remove the unit from the shipping carton and inspect for any damage that may have 

occurred during transportation. Two workers minimum are required to lift the unit from the 
container.

•  Remove housing from shipping carton and inspect for concealed damage and any hardware that 

may have become loose in transit.

•  If RSR configuration is ordered, the RSR Adaptor frame and grill will be shipped in a separate 

shipping carton and will need to be inspected for concealed damage and any hardware that may 
have become loose in transit.

•  The grill for the RSR Adaptor should be set aside. It is good practice to label or mark the grill and 

trim components to match with the respective unit to ensure a good fit.

Fig 1: Unit Unpacking

EQUIPMENT OVERVIEW 

Summary of Contents for AstroFan EC FFU

Page 1: ...AstroFan EC FFU INSTALLATION OPERATION AND MAINTENANCE MANUAL E508161...

Page 2: ...val 09 Filter Unpacking Installation Storage and Operation 10 Unpacking 10 Installation of Gel Seal Filters 10 Storage 11 Operating Conditions 11 Aerosol Injection and Static Pressure Upstream Aerosol...

Page 3: ...ated filters All ancillary tasks including but not limited to electrical and mechanical work equipment handling and safety procedures must be performed in accordance with industry accepted practice an...

Page 4: ...WARNING Risk of electrical shock Can cause injury or death Disconnect all remote electrical power before servicing If connected to a circuit protected device by fuses use time delay fuses for this ap...

Page 5: ...TSS the AstroFan EC FFU housing sits on top of the HEPA ULPA filter frame For RSR the housing sits on top of an RSR Filter Adaptor Frame Extruded Aluminum and the RSR Filter is installed from the room...

Page 6: ...mum are required to lift the unit from the container Remove housing from shipping carton and inspect for concealed damage and any hardware that may have become loose in transit If RSR configuration is...

Page 7: ...are inlet contractor is responsible for securing and sealing duct work to factory supplied blank flange Housing installation must be accomplished in a professional manner to prevent contaminant infilt...

Page 8: ...is recommended that two 2 people work together to ensure proper handling of units If using a flexible grid typically supported with wires or rod the unit must be secured to an engineered support syst...

Page 9: ...n all exposed corners to guarantee a smooth cleanable surface White powder coat paint is supplied as standard finish The PermaFrame is ordered separate from the AstroFan units and filters Drawing Note...

Page 10: ...lle to the room side Acorn nuts and flat washers are installed on each stud to secure the grille in place To remove grille 1 Loosen and remove the acorn nuts and flat washers 2 Carefully remove and lo...

Page 11: ...bagged and packed in reinforced cartons The filter should now be handled with extreme care to avoid contact with the media and or face screen While the bag is still present carry the filter by grabbi...

Page 12: ...te or pressure drop Aerosol Injection and Static Pressure Upstream Aerosol Ports The AstroFan EC FFU RSR is supplied with room side aerosol injection port and aerosol dispersion system as well as an u...

Page 13: ...tions is the responsibility of the design engineer The 2 foil back option is an aluminum foil backed fiberglass installed 6 0 R value attached to the outside of the housing using adhesive mounted insu...

Page 14: ...ized per governing code It is highly recommended that power be supplied to each unit discretely Communication with the motor can be established by attaching CAT 5 CAT 5E or CAT 6 cable to COMS 1 or 2...

Page 15: ...14 WIRING DIAGRAM FOR EBM BLOWERS AND AAF FLANDERS CONTROL INTERFACE...

Page 16: ...emoval and re installation of such product s or goods including but not limited to labor service costs and shipping charges The same obligations and conditions shall extend to replacement parts furnis...

Page 17: ...16 APPENDIX B MANUAL REVISION HISTORY Revision Version Revision Date Description of Change Approval...

Page 18: ...e OK Bartow FL Columbia MO Fayetteville AR Hudson NY Momence IL Smithfield NC Tijuana Mexico Votorantim Brazil Washington NC Europe Cramlington UK Gasny France Vitoria Spain Ecoparc France Trencin Slo...

Reviews: