Filter Unpacking, Installation, Storage, and Operation

Unpacking

• Before removing the filter module from the carton carefully read the removal and handling 

instructions printed on the outside of the carton.

• AAF Flanders cleanroom filters may come packaged in suitcase-style cardboard sleeves. If so, 

simply reach into the box and grab the pre-punched handles within the insert.

• If the filter is in a cardboard liner, the filter must be oriented so that the open ends of the liner are 

facing outward (i.e., to your left and right rather than upward). Carefully cut the packing tape that 
holds the filter in the liner. Always check for torn or deflected liner edges. If any are found, straighten 
or flatten such edges prior to liner removal to prevent media damage.

• One person should carefully hold the plastic bag(s) while the other person carefully pulls the liner, 

sliding it away from the filter.

• Panel filters will be single- or double-bagged (depending on customer requirements) with snug-

fitting cardboard liners. Ducted filters will be single- or double-bagged and packed in reinforced 
cartons.

• The filter should be handled with extreme care to avoid contact with the media and/or face screen.
• While the bag is still present, carry the filter by grabbing the bag. Be careful to keep the filter away 

from your body and any objects in your path.

- If the bag is not present, always handle filter by the frame, avoiding contact with the media and/

or face screen.

• Remove the bag carefully. Avoid bringing hands and fingers into contact with the filter media.
• Additional precautions for gel seal filters:

- Care is taken at the factory to prevent the bag from contacting the gel. Be very careful when 

unpacking gel seal filters by removing the bag slowly and carefully.

- If the bag comes in contact with the gel, pull the bag off the gel slowly. Quick removal of the bag 

may cause damage to the gel and possible separation of gel from the gel channel.

Grille Installation and Removal

The standard grille is removable and made of 40% open area 316L Stainless Steel, but painted cold-
rolled steel is available. Grille mounting can be supplied as standard four (4) corner acorn nut design.

Fig. 05 Grille Mounting

Summary of Contents for AstroHood S-lll RSR

Page 1: ...AstroHood S lII RSR AstroHood S lll RSR Ducted HEPA Terminal Hoods INSTALLATION OPERATION AND MAINTENANCE MANUAL...

Page 2: ...maFrame for Hard Gypsum Ceilings 05 Grille Installation and Removal 07 Filter Unpacking Installation Storage and Operation 07 08 Unpacking 07 Installation 07 Storage 07 Operating Conditions 07 Static...

Page 3: ...sks including but not limited to electrical and mechanical work equipment handling and safety procedures must be performed in accordance with industry accepted practice and all relevant local state an...

Page 4: ...e of spun aluminum and the inlet collar is ribbed to secure the flex duct retaining strap A 22 gauge 40 open area removable perforated grille protects the media pack Hanging holes 1 8 in diameter are...

Page 5: ...ealed to the grid using RTV Dow Corning 732 or GE 102 is recommended 1 Thoroughly clean the mating surfaces of the unit flange and ceiling grid to remove any debris or residue that may inhibit an adeq...

Page 6: ...osed corners guarantees a smooth cleanable surface White powder coat paint is supplied as standard finish The PermaFrame is ordered separately from the AstroHood unit Drawing Notes Construction 18 ga...

Page 7: ...ardboard liners Ducted filters will be single or double bagged and packed in reinforced cartons The filter should be handled with extreme care to avoid contact with the media and or face screen While...

Page 8: ...trolled Temperature Limits Maximum temperatures of 250 F 121 C intermittent and 100 F 38 C steady state Minimum temperature is 32 F 0 C Operating Conditions Temperature The maximum operating temperatu...

Page 9: ...event heat loss mitigate potential condensation and or provide sound attenuation Determining the use of these options is the responsibility of the design engineer The 2 foil backed option is an alumin...

Page 10: ...emoval and re installation of such product s or goods including but not limited to labor service costs and shipping charges The same obligations and conditions shall extend to replacement parts furnis...

Page 11: ...10 APPENDIX B MANUAL REVISION HISTORY Revision Version Revision Date Description of Change Approval...

Page 12: ...artow FL Columbia MO Fayetteville AR Hudson NY Momence IL Ontario CA Smithfield NC Tijuana Mexico Votorantim Brazil Washington NC Europe Cramlington UK Gasny France Vitoria Spain Ecoparc France Trenci...

Reviews: