15
FabriPulse
®
M
©
2015 American Air Filter Company, Inc. Any use of the text or
images this document contains, without permission of American Air
Filter Company, Inc., is prohibited. FabriPulse, AAF, REDClean,
REDFiltration, and Reliable Efficient Durable are registered
trademarks of American Air Filter Company, Inc. d/b/a AAF
International.
seismic loads. Check the drawings of the specific FabriPulse M ordered for the dust
collector weight.
8.3
Anchoring
See the specific FabriPulse M collector drawing for anchor bolt location.
Anchor bolts must extend at least 1.75 inches above the foundation. The collector
should be located with consideration for emptying hoppers, electrical and air
connections and maintenance, and should have the shortest run of ductwork
possible.
9
ASSEMBLY AND INSTALLATION
9.1
Introduction
Safe and efficient operation of the FabriPulse M depends on proper
installation.
AAF recommends that the ductwork going into the collector be as straight as
possible, with at least 5 diameters of straight run recommended.
Authorities with jurisdiction should be consulted before installing the
FabriPulse M to insure local installation codes and installation procedures are
followed.
A qualified installation and service agent must complete installation and
service of the dust collector and equipment.
Ensure all covers from shipping and loose materials are removed from the
collector before installation. Failure to do so can result in failure of the dust
collector.
Ensure the hardware on the dust collector assemblies are properly installed
and tight before installation.