5
FabriPulse
®
M
©
2015 American Air Filter Company, Inc. Any use of the text or
images this document contains, without permission of American Air
Filter Company, Inc., is prohibited. FabriPulse, AAF, REDClean,
REDFiltration, and Reliable Efficient Durable are registered
trademarks of American Air Filter Company, Inc. d/b/a AAF
International.
1
INTRODUCTION
This document contains the information necessary to properly receive,
assemble, install, operate, and maintain
the AAF FabriPulse Design “M” filter
system and filters. The purchaser, installer, and operator of the filter system MUST
read and comply with this document in its entirety prior to installation of the
equipment and its operation. Failure to comply with the requirements of this
manual may void the product warranty. The information and guidelines contained
in this manual are not exhaustive, and additional or different precautions,
measures, training, etc. may be needed depending on the specific circumstances.
CAUTION: These instructions are specific to the AAF FabriPulse M filter
system and filters. All ancillary tasks including, but not limited to, electrical
and mechanical work, equipment handling, and safety procedures must be
performed in accordance with industry accepted practice and all relevant
local, state, and federal government codes, laws, and policies.
2
SAFETY
2.1
Safety statement
The air cleaning equipment supplied by AAF International ranges from very
large multiple-component assemblies which require significant and complex,
rigging, handling and assembly on-site, to small compact assemblies that are
easily handled and maneuvered. In addition to size, many of the dust collectors
will require electrical connections, compressed air connections, and will feature
high speed rotating equipment.
At all times, when dealing with industrial equipment such as dust collection
equipment personnel safety must be the highest priority of all involved, from
riggers, installers, operators, users, and maintenance personnel. Those
responsible on-site shall review the details of the equipment beforehand and
develop a plan for dealing with all stages of the installation from receipt of the
equipment on-site to start-up, commissioning, and hand-over. All applicable
health, safety, and environmental (“HSE”) rules, regulations, and legislation shall
be fully complied with at all times.
2.2
Safe working practices and staff training
AAF International is fully committed to the safety of its employees and those
of its customers. In this spirit the following guidelines are offered for the
consideration of those responsible: