Page 8
HV-WP/HW-WP Series
5. Installing the Scale
5. Installing the Scale
This procedure includes all of the steps for installing the HV-WP series and HW-WP
series. Therefore, on some models, there are some unnecessary steps.
Step 1 Connect the indicator unit to the pole with the
accesory knobs and rubber washers.
Step 2 Take the base unit and pole out, taking care
that the load-cell cable is not pulled.
Step 3 Put the weighing pan on the base unit.
Step 4 Attach the pole to the bracket of the base
unit so as not to damage the load cell cable.
Insert the remainder of the load cell cable
into the pole. Affix the pole to the bracket
using two 3mm Allen screws.
Step 5 Select the place for installing the scale. Also
consider "4. Caution" on page 7.
Step 6 Adjust the level of the base unit by using the
"Bubble spirit level" and "Leveling feet".
Step 7 Ground the scale using the earth terminal.
Caution
Please confirm that the local voltage and
the receptacle type are correct for your
scale.
Step 8 Adjust the angle of the indicator unit using
the knobs on the side of indicator unit.
Step 9 Check the weighing accuracy. If the scale
needs calibration, refer to "14. Calibration".
on page 40.
Step8
Knob
Power terminals
Earth terminal
Step7
Earth
Earth
Base unit
Pole
Load-cell cable
Pan
Step 3
Step 2
3mm allen screws
Step 4
Allen wrench
Pole
Bracket
Bubble spirit level
Leveling feet
OK
NG
Step 6
Power label
Knob
Pole
Cable
Indicator
Rubber washer
Summary of Contents for HW-200KV-WP
Page 72: ...Page 70 HV WP HW WP Series MEMO...