Page 8
BATHTUB INSTALLATION
INSTALLATION DE LA BAIGNOIRE
Make sure that all connections
are waterproof.
Assurez-vous que toutes les
connexions sont étanches.
!
24H
SILIC
ONE
SILIC
ONE
Make sure the strainer and waste pipe are properly attached to the bathtub. Slowly drop the bathtub in place.
Once the bathtub is in place verify that the levelling is correct. Next, do a drainage test to ensure the bathtub drains
properly, if not, adjust the levelling pads. Once the levelling and drainage is correct, secure the lock nuts on the level
-
ling pads.
Make sure that all plumbing fittings are secured and properly fixed. Assure that there are no water leaks prior to
finalizing the installation.
When the installation is complete, apply a continous bead of silicone at the junction of the bathtub skirt and the floor.
Let the silicone cure for 24h before using your bathtub.
S'assurer que la crépine et le tuyau d'évacuation sont bien fixés sur la baignoire. Descendre lentement la baignoire en
place.
Prendre soin de vérifier de nouveau la mise à niveau de la baignoire. Par la suite, faire un test d'écoulement, afin de
s'assurer que la baignoire se draine correctement. Au besoin, ajuster les pattes de nivellement. Une fois la mise à
niveau et l'égouttement conforme, serrer les écrous de blocage sur les pattes de nivellement.
S'assurer que les raccords de plomberie sont correctement fixés et qu'il n'y a aucune fuite d'eau, avant de finaliser
l'installation.
Une fois l’installation terminée, appliquer un filet de silicone à la jonction de la jupe et du plancher. Laisser le silicone
sécher pendant 24h, avant d'utiliser la baignoire.