45
cap. The pipes must be sealed to the cap once
the piping is complete to prevent any leaks in
the unit from penetrating into the building.
A field cutout must be made in the wall if the
evaporative-condensed chiller piping is to go
through the unit wall. This cutout must be
sealed once the piping is installed to prevent
water from leaking into the unit.
Figure 26 - Evaporative-Condensed Chiller Section Layout
Including Field Water Connections and Base Cutout