70
Note that approximately 22% of the total heat
of rejection is accomplished with the
desuperheater at full load. So, the fraction of
heat rejected by the desuperheater (in the
equation above) is approximately 0.22 at full
load and increases as the ambient dry bulb
decreases.
Evaporation Rate
=
1,378,765 (Btu hr
⁄ )
525,000 (Btu hr
⁄
gpm
⁄
)
= 2.63 gpm
Assuming 4 cycles of concentration:
Bleed Rate
=
2.63
4−1
= 0.87 gpm
Mechanical Cleaning
Do not attempt to mechanically clean the
copper tubing in the evaporative-cooled
condenser coil. Do not use wire brushes or
any other mechanical device on the copper
tubing. Severe damage may result. Contact
your
water
treatment
expert
for
recommendations on chemical cleaning
procedures.
Service
If the unit will not operate correctly and a
service company is required, only a company
with service technicians qualified and
experienced in both refrigerant chillers and
air conditioning are permitted to service the
systems to keep warranties in effect. If
assistance is required, the service technician
must contact AAON.
Replacement Parts
Parts for AAON equipment may be obtained
from your local AAON representative. When
ordering parts reference the unit serial
number and part number.
AAON Technical Support
2424 S. Yukon Ave.
Tulsa, OK 74107
Ph: (918) 382-6450
techsupport@AAON.com
www.AAON.com
Note:
Before calling, technician should have
model and serial number of the unit available
for the service department to help answer
questions regarding the unit
Summary of Contents for LZ Series
Page 2: ......
Page 27: ...27 Figure 6 Concrete Pad Mounting with Dimensions Figure 7 LZ Base ...
Page 36: ...36 Figure 17 Typical Flue Vent Piping ...
Page 83: ...83 ...
Page 84: ...84 ...
Page 95: ...95 Flo Trex Cross Section ...