24
Storage
If installation will not occur immediately
following delivery, store equipment in a dry
protected area away from construction traffic
and in the proper orientation as marked on the
packaging with all internal packaging in
place. Secure all loose-shipped items.
Wiring Diagrams
Unit specific wiring diagrams are laminated
and affixed inside the compressor and control
compartment door.
Installation
AAON equipment has been designed for
quick and easy installation.
Unit Location
The curb must be mounted first and must be
located so that duct connections will be clear
of structural members of the building.
Verify rooftop or foundation can support the
total unit weight, including accessory
weights.
Do not position flue opening to discharge into
a fresh air intake of any other piece of
equipment. Unit must also be installed so that
the flow of combustion intake air is not
obstructed from reaching the furnace.
Vent opening must not be blocked by snow.
A minimum 30.5 cm (12”) curb must be used
or the vent outlet must be greater than
30.5 cm (12”) off the ground or roof.
Flue gas is dangerously hot and contains
contaminants. The user is responsible for
determining if vent gases may degrade
building materials.
The National Gas and Propane Installation
Code, B149.1 specifies a 1.8 m (6 ft).
horizontal vent terminal clearance to gas and
electric meters and relief devices.
Local codes may supersede or further place
restrictions on vent termination locations.
Table 1 - Unit Clearances
Location
Unit Size
2-6 tons
Front -
(Heat Exchanger)
91.4 cm (36”)
Back - (Outside
Air)
91.4 cm (36”)
Left Side
61 cm (24”)
Right Side
122 cm (48”)
Top
Unobstructed
When locating gas fired units, the unit
must be installed so that the flue
discharge vents are located at least
305 cm (120 inches) away from any
opening through which combustion
products could enter the building.
WARNING
Distances from adjacent public
walkways,
adjacent buildings,
operable windows and building
openings, must conform to local
codes and/or the National Fuel Gas
Code, ANSI Z223.1/NFPA 54, or the
National Gas & Propane Code, CSA
B149.1
WARNING
Summary of Contents for RQ NextGen Series
Page 2: ......
Page 26: ...26 Figure 3 RQ Cabinet Standard and Power Exhaust Gasket Locations...
Page 40: ...40 Figure 23 Post Corner Hole Piping Figure 24 Post Back Hole Piping...
Page 88: ...88 Gas Heater Operating Instructions Figure 36 Gas Heater Instructions...
Page 95: ...95...
Page 96: ...96...
Page 105: ...105 Maintenance Log E Coated Coil...
Page 107: ...107...