57
SA Series Startup Form
Job Name:_______________________________________________
Date:______________
Address:______________________________________________________________________
______________________________________________________________________________
Model Number:_________________________________________________________________
Serial Number:_____________________________________________ Tag:_______________
Startup Contractor:______________________________________________________________
Address:______________________________________________________________________
_______________________________________________________
Phone:______________
Pre Startup Checklist
Installing contractor should verify the following items.
1.
Is there any visible shipping damage?
Yes No
2.
Is the unit level?
Yes No
3.
Are the unit clearances adequate for service and operation?
Yes No
4.
Do all access doors open freely and are the handles operational?
Yes No
5.
Have all shipping braces been removed?
Yes No
6.
Have all electrical connections been tested for tightness?
Yes No
7.
Does the electrical service correspond to the unit nameplate?
Yes No
8.
On 208/230V units, has transformer tap been checked?
Yes No
9.
Has overcurrent protection been installed to match the unit nameplate
requirement?
Yes No
10.
Have all set screws on the fans been tightened?
Yes No
11.
Do all fans rotate freely?
Yes No
12.
Does the field water piping to the unit appear to be correct per design
parameters?
Yes No
13.
Is all copper tubing isolated so that it does not rub?
Yes No
14.
Are air filters installed with proper orientation?
Yes No
15.
Have condensate drain and p-trap been connected?
Yes No
Ambient Temperature
Ambient Dry Bulb Temperature ________°F
Ambient Wet Bulb Temperature ________°F
Summary of Contents for SA-028
Page 2: ......
Page 20: ...20 Figure 2 One Piece Single Unit Lifting Details...
Page 21: ...21 Figure 3 Two Piece Single Unit Coil Section Lifting Details...
Page 22: ...22 Figure 4 Two Piece Single Unit Fan Section Lifting Details...
Page 23: ...23 Figure 5 One Piece Dual Unit Lifting Details...
Page 24: ...24 Figure 6 Two Piece Dual Unit Coil Section Lifting Details...
Page 25: ...25 Figure 7 Two Piece Dual Unit Fan Section Lifting Details...
Page 28: ...28 Figure 10 Dual unit with splices after being bolted together...
Page 63: ...63...