4.3.3
Erect the posts
Erect the 4 posts and locate them precisely according to the chalk lines. And insert 2 diagonal anchor bolts for each
li�.
Do NOT �ghten at this step.
4.3.4
Runways of lower pla�orm
Install the runways of lower pla�orm. The le� runway is special and has hydraulic cylinder beneath. The right
runway is clean in bo�om.
Le�
Right
Hydraulic cylinder
beneath
(9)
anchor bolts at diagonal
(10) Runways of lower pla�orm
!
10
AL
2525 &
AL
2625
USER MANUAL