4.3.20
Test run
Feed power to the parking system according to electrical diagram in chapter 5.4 Electrical Diagram, and test run for
couple of �mes.
Re-adjust the levelness of steel ropes and pla�orms if necessary.
4.3.21
Fasten the anchor bolts
Once the pla�orms are leveled, fasten all the anchor bolts.
4.3.22
Cover plates of pla�orms
There are 5 covers plates for each pla�orm between le� and right runways.
For the upper pla�orm, the cover plates can be simply lay into the middle of runways.
For the lower pla�orm, the cover plates shall be screwed together with runways.
Please note that the screws must NOT cause any damages to sliding blocks beneath Le� runway of lower
pla�orm, any protruding screw heads facing sliding blocks MUST be cut off.
4.4
Final Checklist
Make sure that all the below items have been sa�sfied before pu�ng your parking li� into service:
■
Review the en�re installa�on steps and make sure that all steps have been executed correctly.
■
Make sure the power pack has go�en power from the power source.
■
Make sure that enough hydraulic oil has been put into oil tank, with correct oil grade as required.
■
Check the hydraulic oi tubings for any leaking points.
■
Check the four posts, which shall be properly anchored and leveled.
■
Make sure all the steel ropes are routed correctly.
■
Make sure all the safety locks and electromagnets are working fine.
■
Make sure the emergency stop bu�on is well func�oned.
■
Make sure you have le� this User Manual to the operator or your customer.
!